Toilet block progress as at 25 June 2022

This week the concrete floor was laid in the BBQ and shower areas. The other end doesn’t seem to have changed.

Go to the new Waikawa News site.
Sign up for the monthly Waikawa Newsletter.
Latest E. Coli reading, 07 February 2023: 389 (orange).